Water System Improvements

Interstate Engineering completed the design and bidding for a comprehensive water system improvement project for the City of Strasburg.

Section One of the project included replacement of all existing cast iron mains, replacement of most fire hydrants and replacement of many service line curb stops. The project was bid with two alternates- one for an open cut pipe replacement and one for in-place pipe bursting. The pipe bursting alternate was the most economical.

Section Two involved replacement of the existing elevated water storage tank with a 75,000 gallon elevated tank. Interstate also assisted with securing grant and loan funds for this project. A combination of funding sources was utilized including ARRA and SRF.